SOME MAJOR PROJECT

on ENG/EPC/MC Basis.

100%

FOOLAD SANG

Lime Plant
100%

GOL-E-GOHAR

Pelletizing Plant
93.23%

GOHARZAMIN

Pelletizing Plant
34.45%

SANGAN IRON ORE COMPLEX

Iron Ore Concentrate Plant
100%

CALCIMIN

Zinc Concentrate Production with BZS Method
100%

ESCO

Reconstruction of the Existing RM650 to Produce Rail U33 and UIC60
100%

IRAN AlLLOY STEEL COMPANY

Steel making
88%

ESFAHAN REFINERY

Loading Petroleum Producet
99%

MSC(SABA)

Steel making Expansion Project
100%

ASHTON BULK(7,200tph)

Stacker Counter Weight Frame Design & Analysis
100%

ASHTON BULK (10,000tph)

Stacker Counter Weight Frame Design & Analysis
2.65%

BMISCO

Pelletizing Plant
100%

SBR

Company Building
100%

ESCO

Reuse for Irrigation zarin shahr Treatment Plant Effluent
100%

QAZVIN MUNICIPALITY

Qazvin MSW Leachate Treatment plant
100%

SOUTH ROUHINA STEEL COMPLEX CO

Engineering Services for South Rouhina Steel Making
100%

QAZVIN MUNICIPALITY

Qazvin Waste Transfer Station
5.6%

Foolad Gostar Almass

DR Plant
100%

Fire alarm& Fire Fighting System for kharazi Mega module

Gol-E-Gohar Pelletizing Plant NO.2

Gol-E-Gohar Pelletizing Plant NO.2

On EPC Basis

Client:Gol-E-Gohar

Consortium Partner : Kayson

Location:Sirjan

Start Date :2012

Technology Provider : Outotec

Capacity : 5MTY

Foolad Sang Lime Plant

Foolad Sang Lime Plant

On EPC Basis

Owner:Msc

Client:Foolad Sang

Location: Isfahan

Start Date :2013

Technology Provider :3 Rectangular PFR Chisaki Technology

Capacity : 2x400 TPD

Reconstruction of the Existing RM650 to Produce Rail U33 and UIC60

Reconstruction of the Existing RM650 to Produce Rail U33 and UIC60

MC Services

Client:ESCO

Location:Isfahan

Start Date :2013

Technology Provider : Kuttner

Capacity : 680,000(TPY)

Slab Continuous Casting Machine (NO.5)

Slab Continuous Casting Machine (NO.5)

Engineering

Client:MSC

Location: Isfahan

Start Date :2014

Technology Provider : Xian

Capacity : 2(MTPY)

Saba Steelmaking Expansion Project

Saba Steelmaking Expansion Project

MC Services

Client:MSC

Location:Isfahan

Start Date :2012

Technology Provider : Danieli

Plant Specification : Continuous Hot Strip Mill

Capacity : 1.7(MTPY)

Goharzamin Pelletizing Plant NO.2

Goharzamin Pelletizing Plant NO.2

Engineering

Client:Goharzamin

Location:Sirjan -Kerman

Start Date :2014

Technology Provider : Outotec

Capacity : 5(MTY)

Sangan Iron Ore Concentrate Plant

Sangan Iron Ore Concentrate Plant

Engineering

Owner:KSC

Client:kayson

Location:Sangan

Start Date :2014

Technology Provider : Outotec

Capacity : 2.5(MTY)

Bafgh Pelletizing Plant

Bafgh Pelletizing Plant

MC Services

Client:Bafgh

Location:Yazd

Start Date :2015

Technology Provider : Outotec

Capacity : 5(MTY)

Steel Making (yazd I )

Steel Making (yazd I )

MC Services

Client:Iran Alloy Steel Company

Location:Yazd

Start Date :2014

Technology Provider :Saralle

Capacity : 700,000(TPY)

Zinc Concentrate Production with BZS Method

Zinc Concentrate Production with BZS Method

on EPC Basis

Client:Calcimin Company

Owner:IZMDC

Location:Zanjan

Start Date :2016

Consortium Partner : RMCO

Capacity : 318(TPD)

Esfahan Refinery - Loading Petroleum Producet

Esfahan Refinery - Loading Petroleum Producet

on EPC Basis

Client:Esfahan Refinery

Location:Esfahan

Start Date :2016

Consortium Partner : Pettro texan

Saqqez

Saqqez

MC Services

Client:Mass Group Holding

Location:Kurdistan

Start Date :2017

Technology Provider :Midrex

GALLERY

More than 200 Projects done by SBR that You can See Some Projects in the from of Gallery
read more...